Based on the structure of the old building and the on-site environment, multiple combinations are formed using two entry methods (flat floor entry and staggered half floor entry) and four connection methods (turning direct entry, straight corridor, turning corridor, and turning double ear) to meet different installation conditions and needs, helping passengers solve the problem of getting on and off the building.